Countries
Categories
Bulgaria
Building and Construction
(Click on description to provide feedback)
Title
Description
Acceptance and certification of executive documentation
Your executive documentation will be accepted and you will be issued a certification.
Approval of preliminary investment projects
You will get an approval of preliminary investment projects.
Certification of building permit after expired term
If you have been issued building permit, which has lost its validity due to expired term, it can be recertified. The building permit is a document, which is mandatory for the legal execution of the construction. The constructions are executed, only if they are allowed according to the Spatial Planning Act, i.e. if there is a valid building permit issued for them.
Consideration and approval of investment projects used as grounds for issuance of building permit
Your preliminary investment projects, which will be used for issuance of building permit, will be considered and approved. The service is intended for any principal, who wishes to ascertain the regulatory admissibility of their investment intention at the initial phase of the design.
Issuance of building permit for fences
You will be issued a permit for building of fence. The permit is required when the fence is solid or open-work, with height more than 60 cm above the terrain. The building permit is a document, which is mandatory for the legal execution of the construction.
Issuance of building permit with approved project
The building permit is a document, which is mandatory for the legal execution of the construction. The constructions are executed, only if they are allowed according to the Spatial Planning Act, i.e. if there is a valid building permit issued for them.
Issuance of building permit without approval of investment projects
The building permit is a document, which is mandatory for the legal execution of the construction. The constructions are executed, only if they are allowed according to the Spatial Planning Act, i.e. if there is a valid building permit issued for them.
Issuance of visa for design under art. 140
You will be issued visa for design for beginning of new construction or reconstruction of already existing building.
Registration and commissioning of constructions, issuance of certificate of commissioning for the types of constructions
You will be issued a certificate for commissioning of construction from fourth or fifth category, establishing the functional suitability for use of the construction, according to the issued construction papers. The permit is necessary for any owner or investor, who is about to commission finished construction project.
Submitting and entering technical passport of building in the register
The service provides submission and filing of technical passport of a building in a register. The technical passport is part of the construction papers. The owners of buildings assign with a contract the drafting of the technical passports. The technical passport of a new construction is drawn up before issuing a usage permission or a certificate of commissioning. It is drawn up in two originals on paper, as well as in electronic format. The technical passport is entered in the register within 7 days after delivery.
Permit for construction of fortification elements and/ or public works in Saint Konstantin Resort
The Mayor of Municipality Peshtera issues a permit for construction of fortifications and/ or public works in Saint Konstantin Resort.
Issuance of order for establishment of right of way through land property
The Mayor of Municipality Peshtera issues an order for establishment of right of way through land properties, when no other technical solution is possible.
Right to lay branches of utility networks and facilities of the technical infrastructure through another person's property
The Mayor of the Municipality issues an order for granting right to lay branches of utility networks and facilities of the technical infrastructure through another person's land property, when there is notarized written agreement between the interested parties. In absence of agreement, the interested party files application at the municipal administration, in the cases when passing through properties – state owned, is necessary and when other technical solution is not economically expedient.
Acceptance and certification of executive documentation
Your executive documentation will be accepted and you will be issued a certification.
Approval of communication and transport projects, detailed plans, partial amendments to the masterplan for railway branches
Your communication and transport projects, detailed plans, partial amendments to the masterplan for railway branches, will be approved.
Approval of communication and transport projects, detailed plans, partial amendments to the masterplan for site
Your communication and transport projects, detailed plans, partial amendments to the masterplan for site, will be approved.
Approval of communication and transport projects, detailed plans, partial amendments to the masterplan for streets
Your communication and transport projects, detailed plans, partial amendments to the masterplan for streets, will be approved.
Approval of engineering infrastructure projects for heating, gas, water and sewage networks: up to 500 m
The service allows you to receive Approval of enginnering infrastructure projects for heating, gas, water and sewage networks: up to 500 m.
Approval of engineering infrastructure, projects for heating, gas, water and sewage networks: up to 1000 m
The service allows you to receive Approval of engineering infrastructure, projects for heating, gas, water and sewage networks: up to 1000 m.
Approval of preliminary investment projects
Please select territorial administration where you request / receive service. Select "Search" button to check whether the service is provided in the selected portal administration.
Approval of projects of the engineering infrastructure for electrical and communication cables and overhead lines: above 1000 m
Your projects of the engineering infrastructure for electrical and communication cables and overhead lines: above 1000 m, will be approved.
Approval of projects of the engineering infrastructure for electrical and communication cables and overhead lines: up to 100 m
Your projects of the engineering infrastructure for electrical and communication cables and overhead lines: up to 100 m, will be approved.
Approval of projects of the engineering infrastructure for electrical and communication cables and overhead lines: up to 1000 m
Your projects of the engineering infrastructure for electrical and communication cables and overhead lines: up to 1000 m, will be approved.
Approval of projects of the engineering infrastructure for electrical and communication cables and overhead lines: up to 500 m
Your projects of the engineering infrastructure for electrical and communication cables and overhead lines: up to 500 m, will be approved.
Approval of projects of the engineering infrastructure for heat transfer systems, gas, water and sewage networks: above 1000 m
Your projects of the engineering infrastructure for heat transfer systems, gas, water and sewage networks: above 1000 m, will be approved.
Approval of transport communication projects, detailed development plans /DDP/ partial modifications of DDP for intersections /for area marked with stop-lines/
You will get an approval of transport communication projects, detailed development plans (DDP), partial modifications of DDP for intersections (for area marked with stop-lines).
Consideration and approval of technical and working projects and issuance of building permit with compliance assessment report or by Municipal Expert Council
The Mayor of the Municipality issues building permit after consideration and approval of technical and working projects with evaluation report for compliance with the detailed development plan.
Coordination of projects for construction of road connections with municipal roads for a complex with more than two sites
The Mayor of Municipality Peshtera issues an order for passage through municipal land properties, when other technical solution is not economically beneficial. The Chief Architect of the Municipality approves the order. The order is entered into the register of properties under the batch of the land property and in the title deed for municipal property
Coordination of projects for construction of road connections with municipal roads for a complex with two sites
The Mayor of Municipality Peshtera issues an order for passage through municipal land properties, when other technical solution is not economically beneficial. The Chief Architect of the Municipality approves the order. The order is entered into the register of properties under the batch of the land property and in the title deed for municipal property.
Coordination of projects for construction of road connections with municipal roads for a movable unit
The Mayor of Municipality Peshtera issues an order for passage through municipal land properties, when other technical solution is not economically beneficial. The Chief Architect of the Municipality approves the order. The order is entered into the register of properties under the batch of the land property and in the title deed for municipal property.
Coordination of projects for construction of road connections with municipal roads for single site
The Mayor of Municipality Peshtera issues an order for passage through municipal land properties, when other technical solution is not economically beneficial. The Chief Architect of the Municipality approves the order. The order is entered into the register of properties under the batch of the land property and in the title deed for municipal property.
Preparation of Compliance assessment for projects for parks, gardens and green areas and their renovation and reconstruction
Your preliminary investment project will be assessed for compliance with the stipulations of the detailed development plan, and the requirements for the constructions, according to the regulatory requirements for:
Preparation of compliance assessment for construction /technical and working projects/ for new buildings, extensions and superstructures
Your preliminary investment project will be assessed for compliance with the stipulations of the detailed development plan, and the requirements for the constructions
Preparation of compliance assessment for projects for private roads and facilities thereof, projects for elements of the technical infrastructure, hydro-technical, hydro-melioration, cable and other networks, facilities and installations
Your preliminary investment project will be assessed for compliance with the stipulations of the detailed development plan, with the rules and regulations for the territorial development, the requirements for the constructions, according to the regulatory requirements for functionality; transport accessibility; environmental protection, and health protection, as well as to coordination between the different parts of the project.
Preparation of compliance assessment for projects for reconstruction, major repairs and change of designation of existing buildings or part thereof
Your preliminary investment project will be assessed for compliance with the stipulations of the detailed development plan, and the requirements for the constructions,
Registration and commissioning of constructions, issuance of certificate of commissioning for the types of constructions
You will be issued a certificate for commissioning of construction from fourth or fifth category, establishing the functional suitability for use of the construction, according to the issued construction papers. The permit is necessary for any owner or investor, who is about to commission finished construction project.
Submitting and entering technical passport of building in the register
The service provides submission and filing of technical passport of a building in a register. The technical passport is part of the construction papers. The owners of buildings assign with a contract the drafting of the technical passports. The technical passport of a new construction is drawn up before issuing a usage permission or a certificate of commissioning. It is drawn up in two originals on paper, as well as in electronic format. The technical passport is entered in the register within 7 days after delivery.